Skanska

Aims

Exelin worked with Skanska on two specific construction projects:

Glenfrome School in Bristol – a project to extend and refurbish a Bristol Primary school over the school summer holidays; and

The housing development of the former Battersea Power station in London.

Actions

We worked with the Skanska teams and their partners to map the whole build process including procurement, logistics, assembly and sign off to develop a robust operating model for future projects.

Outcomes

Cost and time savings of 44% and 60% respectively have been recorded, plus additional benefits in terms of safety, quality and sustainability.

For the Battersea Utility cupboards, the rate of production was doubled compared to traditional methods of construction.

Enhanced Programme-control, flexibility through better reaction to change

Quality improvements reduced defects and rework

Improved safety regime and the ability to remove work away from other trades

Efficiency improvement savings could be offered to the client

Cash flow – through lean optimisation, managing demand for site and potential off-site valuations

Ability to use less skilled labour, reduction in labour costs

Overall a greener solution, through optimised transport scheduling

Reduced overhead costs compared to fixed factory setups due to optimal utilisation